European Commission launches 6th call for Cross-Border Renewable Energy projects
One number frames the opportunity: more than €165 million has already gone to 17 cross-border renewable energy projects through the EU’s CB RES programme.

Now CINEA, the European Climate, Infrastructure and Environment Executive Agency, has opened the sixth — and final — status call under the current 2021–2027 financial framework. For project developers, cities, utilities, and climate-focused investors, this is not just another Brussels process. It is a gateway that can determine whether a renewable project is visible, fundable, and politically supported across borders.
The status is the key, not the paperwork
CINEA launched the call on 29 June for projects seeking Cross-Border Renewable Energy status. That status matters because it is mandatory for projects that want to access EU funding for studies and works under the CB RES window of the CEF Energy Programme.
The deadline is clear: eligible promoters can submit applications through the dedicated CB RES submission platform until 6 October 2026.
The practical implication is straightforward. If a project depends on cross-border cooperation and may need EU-level backing, this call is the entry point. Without CB RES status, access to the relevant CEF Energy funding route is not available. With it, a project can become eligible for financial support, gain EU-level visibility, strengthen support from Member States, and improve investor confidence.
That last point is not decorative. Renewable infrastructure often fails not on technology alone, but on coordination: permits, national priorities, risk allocation, and grid or resource planning across jurisdictions. A formal EU status does not solve every bottleneck, but it can reduce ambiguity around whether a project fits a recognized policy and funding channel.
What kinds of projects can fit
The CB RES window was launched in 2021 to support renewable energy projects built around cross-border cooperation. That cooperation can be between EU Member States, or between Member States and non-EU countries.
The eligible technology set is broad. CINEA lists onshore and offshore wind, solar, sustainable biomass, ocean energy, geothermal energy, and hybrid solutions. In other words, the programme is not built around a single technology bet. It is structured around the harder systems question: where can renewable generation, geography, and cooperation yield more than a purely national project would?
That makes the call relevant beyond large offshore concepts. Hybrid renewable projects, geothermal partnerships, and shared regional energy assets may all have reason to test eligibility if their structure genuinely crosses borders.
CINEA also organized a virtual information day to explain the policy context, application and evaluation process, and practical points for preparing a proposal. The recording and materials are available, which gives promoters a low-friction way to benchmark whether their project is mature enough to proceed.
What to watch before 2027
This call is described as the last CB RES status call under the current 2021–2027 Multiannual Financial Framework. Projects awarded status through it may then have the opportunity to apply for the final CEF Energy CB RES funding call for studies and works, expected in 2027.
That sequence matters. Status comes first; possible funding comes later. Promoters should treat the 2026 deadline as the near-term decision point, not wait for the 2027 funding call to begin internal alignment.
The evidence so far is measurable rather than speculative: since the programme’s creation, it has awarded more than €165 million to 17 innovative projects. CINEA says these projects contribute to EU decarbonisation goals and help strengthen security of energy supply.
For the climate sector, the signal is pragmatic. Europe is not only trying to add renewable capacity; it is trying to optimize where that capacity is planned, financed, and politically anchored. The next useful metric will be how many credible projects use this final status window — and how many are ready to convert recognition into construction-stage progress.